Extension of Apron North-East construction phase 2B / 2C
location:
Airport Wien/Schwechat (Austria)
planner:
Werner Consult, Wien
realization:
Alpine-Mayreder Bau GmbH
Information about this building project
Area: 55.000 m2 concrete ceiling, 85.000 m2 asphalt (approx. an area of roundly 14 hectare constructed area)
The new building Skylink is 550 m long / 16 depature processing positions are at your disposal.
The current clearance of approx. 16,5 mio passengers, the new terminal has capacity of approx. 25 mio passengers.
starting up:
at the end of 2008
products:
BG safety channels,
Nominal width 100 and 200
ductile iron grating, loading class F, 900 kN
BGZ-S heavy duty channels